Showroom Milan
Year of completion: 2021
Materials used: dry marble, resin, brass and glass.
Works: setting up of metal carpentry structure, necessary for the dry laying of the marble, suspended from the ground.
Preparation of the floor adjacent to the metro, with light wood-based material.
Upper formation of micro-cement, brass and marble inserts.
Preparation of the corridor wall, which is necessary for the installation of dry-lay marble, after laser tracing of each individual point, as required for dry-lay, diamond-cut marble.
Reinforcement of the floor slab, needed to support the marble counter.

